A model version cannot move from Staging → Production directly; it must always go through approval. Both requesting and approving can be done by the approver or admin role. This page is done with an approver account.

Promotion request

  1. In the sidebar, open Model Registry (모델 레지스트리) and open the model. Version history (버전 히스토리) ① shows the stage of each version (Staging, Production, Archived). Press Promote to production (프로덕션 승격) ②.
    Model detail — ① versions and stages ② Promote to production
  2. Choose the Version to promote (승격 버전) and enter a Reason (사유) (required). Rollback condition (롤백 조건) and Scope (범위) are kept alongside as grounds for the approver's judgement. Press Request promotion (승격 요청).
    Production promotion request — version, reason, rollback condition, scope

After you request, a "Promotion request created (승격 요청 생성됨)" notification appears and the tenant members are notified. An "Awaiting approval (승인 대기 중)" indicator appears at the top of the model screen. While a request for the same version is already pending, you cannot request again.

Approval

  1. Open Approvals (승인) in the sidebar (a badge shows the number pending). Click a request with Needs my decision (내 결정 필요) ① in the My involvement (나와의 관계) column.
    Approvals — ① requests waiting for my decision
  2. Under Evidence (근거), check the reason, rollback condition, scope and requester, then press Approvals (승인). Leave a Comment (optional) (코멘트 (선택)) and confirm with Approvals (승인) in the dialog. If you cannot accept it, press Reject (반려) and enter a reason (required).
    Approving on the approval detail — the version becomes Production and the previous Production version moves to Archived

Once the required number of approvals is reached, the server

  1. closes the request as Approved (승인됨),
  2. changes that version to Production, and moves the previous Production version down to Archived.
  3. sends notifications to the requester and the tenant.

Next: 7. Serving

Written for the platform as of 2026-09-21.

© Geo-MLOps