Approvals
Review Production promotion requests for models and approve or reject them.
Required permission: ApproveAPPROVER · ADMIN
This screen collects the Production promotion requests made in the Model registry. It appears in the sidebar only for people with the approval permission (approve — APPROVER, ADMIN), and the number next to it is the number of pending requests.
Approval list
| # | Area | Description |
|---|---|---|
| ① | Status filter | Pending (대기) by default. Switch to Approved, Rejected or All (승인됨·반려됨·전체) for past requests. |
| ② | My involvement (나와의 관계) | Needs my decision (내 결정 필요) (you must approve or reject), My requests (내 요청), Approved by me (승인함), Rejected by me (반려함). |
| ③ | Status (상태) | Pending, Approved, Rejected (대기·승인됨·반려됨). A request that needs several approvals shows its progress while pending, such as 1/2. |
The type is Production promotion (프로덕션 승격), and the target is "model v1→v2" (current Production → version to promote). With no current Production version, only the version to promote is shown. Click the model name to open the model registry. Requester (요청자) is the person who asked; Waiting (대기) is the time since the request. Click a row to open the detail.
Approval detail
The title line shows the model name (opens the model detail), the status, "v1 → v2" (the version to promote opens the model version detail), and the time since the request.
| # | Area | Description |
|---|---|---|
| ① | Evidence (근거) | The reason, rollback conditions and scope the requester wrote, the requester, and progress (approvals n / required m). If you already decided, My decision (내 결정) appears too. |
| ② | Decision history (결정 이력) | Who approved or rejected and when, with comments. |
| ③ | Approve (승인) · Reject (반려) | Disabled, with the reason beside them, if the request is already handled or you have already decided on it. When you already decided, the reason reads "You do not have approval permission (승인 권한이 없습니다.)". |
Main tasks
- From the list, open a request marked Needs my decision (내 결정 필요).
- Read the evidence and press Approve (승인). A comment is optional.
Approve dialog — the comment is optional - Once all required approvals are collected, that version becomes Production and the previous Production version moves down to Archived. The requester gets an approval notification and tenant members get a Production change notification (except the final approver). If approvals are missing, an "Approval 1/2 — more approvers are needed (승인 1/2 — 승인자가 더 필요합니다)" notice appears and the request stays pending.
To reject, press Reject (반려) and enter a rejection reason (반려 사유) (required). The reason is sent to the requester as a notification.
Statuses and badges
| Badge | Value | Meaning |
|---|---|---|
| Pending (대기) | PENDING | Not all approvals collected yet |
| Approved (승인됨) | APPROVED | The required approvals were collected and the version became Production |
| Rejected (반려됨) | REJECTED | Someone rejected it — unlike a request still short of approvals, it is closed |